One page website templates

Publish a one page website on your own domain in minutes. No code, and free to try for 15 days.

15-day free trial · No card required

Picking the right one

How to choose a one page website template

Each layout is a single scrolling page with anchor navigation built in, mobile-responsive and customizable down to type, color, spacing and custom CSS. You can switch template types inside Pixpa without rebuilding, so this is a starting call, not a permanent one.

  • Does your content fit on one page?

    One page works when a visitor can take in the whole story on a single scroll: a portfolio, a personal or CV site, a link hub, a single product, a launch. If your content splits into sections that each need room to breathe and their own URL, a multi-page template serves you better.

  • Pace the scroll

    On a one page site, design is pacing. The reader moves top to bottom in one motion, so each section has to earn the scroll to the next. Look for clear breaks between sections, room for full-width images, and a rhythm that does not stall halfway down.

  • Anchor navigation and one clear next step

    A one page site still needs a menu, it just scrolls to sections instead of loading new pages. Every Pixpa one page template ships with anchor navigation, so a visitor can jump to Work or Contact and land in the right place. Decide the one action you want them to take and make that the end of the scroll.

  • Speed matters more on one page

    A one page site loads its whole story in one request, so heavy images hurt more here than on a multi-page site. Pixpa auto-optimises every image per device and serves the site over a global CDN with free SSL, so a long visual page still loads fast on a phone.

Pixpa portfolio website templates
Pixpa portfolio website templates
Pixpa portfolio website templates
A Pixpa one page website with anchor navigation and a mobile layout preview

Everything You Need

What’s included with every one page website template

  • Drag and drop editor, no code

    Change layout, type, color, spacing and images by clicking and dragging. Nothing to install.

  • Custom CSS and HTML

    When you want control past the defaults, add your own CSS and HTML on the same page.

  • Mobile-responsive, auto-optimized

    Every template adapts to phone, tablet and desktop, and images are resized per device automatically.

  • Your own domain with free SSL

    Connect a domain you own, or register one, with SSL included.

  • Client Galleries

    If you deliver work to clients, add password-protected galleries with proofing, favorites and secure delivery on the same site.

  • Zero-commission online store

    Sell prints, digital downloads or products from your one page site through the online store. Pixpa takes no commission on sales.

  • Built-in blog and SEO Manager

    Add a blog if the story grows past one page, and control titles, meta and sitemaps yourself.

What customers say

Why Pixpa for your one page website

The one page builders in this space hand you a file to host yourself. A free template is a file: you still have to host it, secure it with SSL, make it responsive, and keep it running when something breaks. Pixpa hands you a live site instead. Pick a template, add your work, connect your domain, and it is online, hosted, with SSL, per-device image optimisation and human support at every tier. Rated 4.7 out of 5 across 600+ Capterra reviews, with template quality, ease of use and support the three things customers name most. See pricing for what each plan includes.

“Website creation was much easier than this non-techie person could have imagined.”

Robin D. Robin D. Artist Fine art · Capterra

“Extremely easy to set up, and it looks beautiful. I was very happy with the theme provided.”

amberl_testimonial Amber L. Photographer · Capterra

FAQs

One page website template FAQs

Everything else you might want to know before you start. Still curious? Live chat is open 24/7.

What are the best one page website templates?

The best one page website template is the one that fits your content on a single scroll without crowding it. Pixpa’s most-used one page layouts include Revel, Element, Calypso and Firebrand, each built with anchor navigation and a mobile-responsive structure. Start the free trial, try two or three, and keep the one that paces your story best.

Every one page template is free to use on any Pixpa plan and during the 15-day free trial. You do not buy templates separately or pay per download. You pay for the plan that hosts your site, connects your domain and runs the store or galleries you switch on.

Yes. You edit every section in a drag and drop editor, changing type, color, spacing and images without touching code. When you do want control, custom CSS and HTML are available on the same page, so a designer can go further without leaving the editor.

Only if you leave it untouched. The layout is a starting point. Once you swap in your own work, fonts, colors and copy, and adjust spacing, the site reads as yours. Custom CSS lets you push it further than the defaults.

A single page website suits a focused story: a portfolio, a personal or CV site, a link hub, a small product or a launch. If your content splits into distinct sections that each need their own page, a multi-page site fits better, and you can switch template types inside Pixpa without rebuilding.

Yes. Switch on the online store and sell prints, digital downloads or products directly from your one page site. Pixpa takes zero commission on sales, so you keep the full amount after the payment processor’s fee.

Every template is mobile-responsive and images are auto-optimized for each device, which matters more on a single page because everything loads on one scroll. Your site is served over a global CDN with free SSL included.

Yes. You can change templates after publishing and your content carries over, so you are not locked into the first layout you pick. Preview a new template against your real content before you commit.

Yes. The 15-day free trial needs no card, and every paid plan is covered by a 30-day money-back guarantee. That is enough time to build a one page site with your own content and see it live before you pay.

What's new on Pixpa

We use cookies to deliver a better website experience. By continuing to use this website, you agree to our cookie policy.
Got it
Theme
Close
Open in new tab
pixpa