Fashion portfolio templates

Show lookbooks, editorial shoots and collections on a fashion portfolio website that gets out of the image’s way. No code, switch templates anytime.

15-day free trial · No card required

Browse fashion portfolio templates

52 templates built for stylists, designers and fashion photographers: editorial-scale layouts, lookbooks ordered by season or campaign, video embeds for runway, password-protected pages for unreleased work. See also model portfolio website templates and photography portfolio templates.

Picking the right one

How to choose a fashion portfolio template

The right fashion template does three specific jobs. It carries image density without slowing down, it survives on a phone, and it lets you push a brand look past the preset.

  • Image density

    Editorial and lookbook work lives in full-bleed grids and large single frames. Pick a template with gallery layouts that hold high-resolution files and lazy-load below the fold, so a 60-image shoot opens fast instead of stalling.

  • The phone test

    Clients and casting directors judge on mobile first. Every Pixpa template is responsive by default, so you are not maintaining a separate mobile version.

  • Room for the brand

    A stylist’s site and a knitwear label’s site should not look the same. Custom CSS and HTML on every template mean you can match exact type, spacing and color rather than accepting the default.

Pixpa portfolio website templates
Pixpa portfolio website templates
Pixpa portfolio website templates
Fashion portfolio templates by Pixpa with lookbook layouts and a zero-commission store

Everything You Need

What every fashion portfolio template includes

  • Custom CSS and HTML

    Custom CSS and HTML on any design, so the template matches the brand rather than the reverse.

  • Client Galleries

    Private lookbooks and casting selects: password-protected, with client favoriting, ratings, secure delivery and auto-expiry. Zero commission on anything sold through them.

  • Zero-commission online store

    Sell a capsule collection, prints or digital lookbooks. You keep 100% of revenue after processor fees.

  • Lookbook and editorial layouts

    Built for full-bleed imagery, not text-first blog themes.

  • Blog and SEO Manager

    Built-in blog and SEO Manager so the site ranks and updates without a second tool.

  • 24/7 human chat support

    Cited across reviews as a real person, not a bot.

What designers and stylists say

Why fashion designers and stylists choose Pixpa

One login instead of a builder plus a gallery tool plus a store. Show lookbooks, send private selects to a client, sell a small run, all from the same site, with no commission taken. Switchers from Squarespace and Wix name the same two reasons every time: the templates and the price, backed by 4.7 out of 5 across 600+ Capterra reviews over 12 years running.

“Wanted a professional website for my hand model portfolio. Pixpa was the perfect solution: quick and easy at low cost.”

Mederice L. Hand Model · Trustpilot

“Real nice templates you can tweak to your liking and the monthly price is a lot cheaper than most of the main competitors.”

Pier G. Trustpilot

FAQs

Fashion portfolio template FAQs

Everything else you might want to know before you start. Still curious? Live chat is open 24/7.

How do I make a fashion portfolio website?

Pick a fashion portfolio template, drop in your lookbooks and editorial shoots, arrange them into galleries, and connect a custom domain. On Pixpa you can start from any of the 200+ templates, customize the layout without code, and go live in a day. Switch templates later without losing your work.

Every Pixpa template is included on all plans, so you can build on any fashion design during the 15-day free trial with no credit card. There is no separate charge per template and no premium-template upsell. After the trial, plans start at 5.40 dollars a month billed annually.

Yes. Every Pixpa template supports custom CSS and HTML, so you can match a template to a brand's exact type, spacing, and color rather than settling for the preset. Reviewers point to this as a reason they picked Pixpa over more locked-down builders.

Yes. Every template includes a zero-commission online store, so you can sell a capsule collection, prints, or digital lookbooks and keep 100 percent of revenue after payment-processor fees. Pixpa takes no cut of your sales.

Yes. Client Galleries let you share private, password-protected galleries for lookbooks or casting selects, with client favoriting, ratings, and secure delivery. Galleries can auto-expire, and there is zero commission on any prints or files sold through them.

Yes. Every Pixpa template is mobile-optimized, which matters because casting directors and clients often open a portfolio on a phone first. The layouts adapt to the screen without a separate mobile build.

For a portfolio with a store and client delivery, most fashion designers and stylists start on Creator or Professional. Every plan includes all 200+ templates, custom CSS, Client Galleries, a zero-commission store, SEO tools, and 24/7 human support. Start on the 15-day free trial and change plans anytime.

What's new on Pixpa

Theme
Close
Open in new tab
pixpa