Get a Pixpa Design Expert to set up your website foundation

Skip building from scratch. Our designers set up your site from your content, giving you a solid foundation to build on.

US $399US $199

Save $200 · One-time fee · Sale price

Available on any paid Pixpa plan. Already a subscriber? Buy setup in Pixpa Studio

A website set up by a Pixpa designer The Setup Form with template, colors, fonts, logo, text and images filled in Ready in 5–7 business days

How it works

From brief to live site in five steps

  1. Start a trial and upgrade.

    Choose the Pixpa plan that suits you, then add the Website Setup Service from Pixpa Studio.

  2. Send your brief.

    Our Setup Form walks you through it: your template, colors, fonts, logo, text and images. Sending everything together helps us get started right away.

  3. We review it.

    Before we start, we look over your brief and confirm everything with you by email. If anything goes beyond what’s included, we’ll let you know what fits, so there are no surprises. Pixpa does reserve the right to decline a setup request. If that happens, we’ll refund your fee in full.

  4. We build.

    One of our designers sets up your site, usually within 5–7 business days of receiving your complete content.

  5. You review, then it’s yours.

    Take a look and send us any changes you’d like. Once they’re done, the site is all yours to publish and grow.

Who it’s for

Is this service right for you?

A good fit if you:

  • Have your images, text and logo ready, and want a professional site without learning the builder first
  • Want a portfolio, a small store or a blog built on a Pixpa template
  • Plan to update the site yourself once it’s live

It may not be the right fit if you need:

  • A large site with many pages, or a brand-new layout built from scratch
  • Writing, photo editing or SEO work
  • Custom code, or someone to manage the site for you on an ongoing basis

What’s included

We build on your chosen template’s layouts and adapt them to your brand. Everything below is set up using the content you send us.

  • Brand styling: your logo, colors and fonts applied across the site, using Pixpa’s style settings.

  • A website of up to 10 menu items: this includes your Home, About and Contact pages and your portfolio galleries. Within those:

    Pages: up to 25 sections in total.

    Galleries: up to 100 images in total.

  • Blog (optional): set up and styled, with up to 3 posts you share with us.

  • Store (optional): set up with up to 5 products you share with us. Each product can have one option set, such as size or format.

  • Search basics: your site title and homepage description.

  • Domain: help connecting your domain when you’re ready to go live.

What’s not included

  • Writing, editing or sourcing content.

    We’ll use your text and images just as you send them. If anything’s missing, we’ll add placeholder content you can swap in later.

  • Image work.

    Editing, cropping, resizing, renaming, captions and alt text aren’t part of the service, so please send your images ready to go.

  • SEO beyond the basics.

    We set up your site title and homepage description. Page-level SEO, image SEO and keyword work are yours to take on after handover.

  • New layouts or custom code.

    We work within Pixpa’s standard builder, so custom CSS, HTML and brand-new layouts aren’t included.

  • Anything over the limits.

    If your brief goes past a limit, we’ll build up to it, and you can easily add the rest yourself in the builder.

  • Content sent after we start.

    We build from your Setup Form, so anything sent after we’ve started won’t be included.

  • Other setup.

    Client galleries, integrations, popups, email lists and third-party tools are yours to set up whenever you’re ready, and our support team is happy to help.

Revisions

You get one round of revisions. Just send us a single list of up to 10 changes within 7 days of handover. Revisions cover tweaks to what we’ve built, like colors, fonts, spacing or section order, rather than new pages, sections or content. If we don’t hear from you within 7 days, we’ll mark the project as complete.

Showcase

Sites our designers have set up

Portfolios, stores and small-business sites, each built from a client’s own brief and content.

Piet Hurkmans Portfolio Website Examples

Piet Hurkmans

Coach and Mentor

Skyline Template
Hair Stylist website

Angie Phipps

Hair Stylist

Greenhorn Template
The Light Media Portfolio Website Examples

The Light Media

Photography

Color Template
Karen Reuter Portfolio Website Examples

Karen Reuter

Photographer

Glow Template
Isaac Maiselman Portfolio Website Examples

Isaac Maiselman

Photographer

Hyper Template
Warren Smith Portfolio Website Examples

Warren Smith

Artist

Avenue Template
Rebecca Fusca Portfolio Website Examples

Rebecca Fusca

Pet Photographer

Igloo Template
Red X Ink Portfolio Website Examples

Red X Ink

Tattoo Artist

Holmes Template

FAQs

Frequently Asked Questions

Everything else you might want to know before you start. Still curious? Live chat is open 24/7.

How much does it cost?

It’s US $199 one-time, down from the regular $399, plus applicable taxes. The service is available on any paid Pixpa plan, and the fee goes on the same payment method as your subscription.

Usually 5–7 business days from the time we have all your content. If some content arrives later, the timeline moves with it.

A section is one block on a page, like a banner, a text block, a gallery grid or a contact form. You can have up to 25 sections in total.

Writing and photo editing aren’t part of this service. We’ll build with what you send, and use placeholder content for anything missing, which you can replace whenever you like.

You can add them anytime after handover with Pixpa’s drag-and-drop builder. Your styling and layouts will already be in place, so new pages fit right in.

We’d suggest waiting until handover, as changes made during the build may get overwritten. Once it’s handed over, the site is all yours to edit.

If we’re unable to take on your request, we’ll refund you in full. Once work has started, the fee is non-refundable.

Right now, we set up English-language sites only.

Your content, our
designer, one sale price.

Start your 15-day free trial, no card required. Add the setup service for $199 (usually $399) once you’re on a paid plan.

30-day money-back guarantee on Pixpa plans · Questions? Chat with us 24/7

What's new on Pixpa