13 live graphic design portfolios
Every one is a live site run by a designer working with real clients. Browse them, then build yours.
Free for 15 days. No card needed.
Every graphic design website example below is a live site, run by a designer working with real clients, not a mockup or a best-of pick. Filter by the work, or scroll and see what stops you.
Ideas
Every portfolio above makes the same set of decisions. These are the ones that separate the sites that get replies from the ones that get scrolled.
Show fewer pieces than you want to
The instinct is to prove range. The effect is to dilute it. Six projects you can defend in a meeting beat eighteen that include the ones you took for rent money. Cut anything you would apologise for.
Lead with one strong image, not a menu
A landing page that opens with a grid of options asks the visitor to make a decision before they have a reason to care. Open on one piece of work at full width and let it do the arguing.
Lead the navigation with what you actually do
Identity, packaging, editorial, motion. A hiring manager scanning for a packaging designer should not have to open a project to find out whether you do packaging.
Show the process, not only the outcome
Two or three roughs before the final mark is the difference between a portfolio that shows work and one that shows judgement. Art directors are buying the thinking.
Give each case study enough room to state the problem
A logo with no brief behind it reads as decoration, and decoration is what gets scrolled past. One paragraph on what the client needed changes how the same mark is read.
Put contact one click from everywhere
Contact belongs in the header, at the foot of every project, and on its own page. Nobody scrolls back up to find you.
Own the domain
A portfolio on someone else's subdomain is a portfolio you are renting. Your name, your domain, moved with you the next time you switch platform.
Examples
Some of the portfolios above are doing more than showing work. The same site is taking orders, running a blog, and reading in five languages.
Sell prints, templates and digital files with zero commission
Posters, typefaces, Lightroom presets, icon sets, brand kits. Pixpa's store takes no cut of any sale at any plan level, and it runs on the same site as the portfolio. Squarespace charges 2% on store transactions on its entry plan and 7% on digital content and memberships.
Publish process writing on a blog that lives on your domain
Case-study writing is the part of a design portfolio that ranks. A built-in blog means the essay about the rebrand sits on your domain rather than on a platform that owns the audience, and it links straight back into the project it describes.
Publish the same portfolio in nine languages
Design work travels further than the designer does. Pixpa's translation layer serves the site in eight languages alongside English without a second build or a separate URL structure to maintain.
FAQs
Everything else you might want to know before you start. Still curious? Live chat is open 24/7.
A graphic design portfolio is a curated set of a designer's work presented as evidence of what they can be hired to do. In practice it means a small number of projects, each shown with the brief behind it, on a site the designer controls. It is a sales document more than an archive, which is why the editing matters more than the volume.
It opens on one piece of work rather than a menu. It carries somewhere between five and ten projects rather than everything the designer has made. Each project states the problem before showing the solution, and the navigation names disciplines the designer wants to be hired for. Contact details sit within one click from any page.
Graphic design portfolios tend to share the same components: a small set of complete projects, a short brief or context paragraph on each, some evidence of process such as sketches or rejected routes, a short bio that says what the designer does and for whom, and a contact route. Client logos and testimonials appear on studio sites more often than on freelance ones.
Most graphic design portfolios run between five and ten projects. Below five it reads as thin. Above about twelve the strongest work starts competing with the weakest, and the visitor forms an impression from whatever they happen to scroll past. The number is less important than whether every piece is one you would be happy to be hired on the strength of.
Yes. Every example in the gallery is a live site run by a working designer or studio, not a demo or a mockup. Clicking a card opens the site itself. The gallery updates as designers join and leave the platform, so the set changes over time.
Every card names the template underneath the site, and the preview panel links straight to it. Any template can be opened and edited on a free trial, so a layout you like in the gallery is a starting point rather than something to rebuild from scratch. Type, colour, spacing and layout are all editable, and every template accepts custom CSS and HTML.
Get Started
Pick a template from the grid above, drop in six projects, and point your domain at it.
No card required. 30-day money-back guarantee. Zero commission on anything you sell.